FSC

Engineering Solutions
Our company is a well-established and equipped company dealing with
supply and manufacture of Steel Structures
Social Media
Innovating the Engineering
Company was founded in 2022,
provides consultancy, design, manufacturing, insulation and services
Social Media
Excellence in Engineering
Our company construct its own factory in Qantara Shark, Sinai - Egypt
with administration building with total area of 2400 m2.
Social Media
About Us

Our company is a well-established and equipped company

dealing with supply and manufacture of Steel Structures and execute contracting , construction activities and other related complementy activities with its trading name "Founders Supplying & Constructions" .

about-h4-img1

24/7 Consultancy Services Available

Professional Construction Service

pro_5
Founders Supplying & Constructions

Who We Are

Our company is a well-established and equipped company dealing with supply and manufacture of Steel Structures, execute contracting , constructions activities, and other related and complementary activities with its trading name "Founders Supplying & Constructions". Founders Supplying & Constructions “FSC” Company was founded in 2022, provides consultancy, design, manufacturing, installation and services for all types of Space Skelton Steel Construction Systems, as well as contracting, construction and infrastructure activities. FSC owns factory in Qantara Shark, Sinai – Egypt to design and manufacturing steel structure and space frame.

ASSOTIATED COMPANIES

Founders Supplying & Constructions “FSC” Company has association companies as partners and assistance as follows:

Founders Supplying & Constructions

Why Choose Us

Our company has full time employees of four structural and civil engineers, two technical supervisor, five certified welders, twelve technicians, and 25 unskilled labors, in addition to financial and administrative officers. Our company has a workshop of 1400 m2, equipped with necessary machines for steel fabrication. Moreover we associate with highly equipped workshop for biggest scale jobs.
Learn More About us

Company Documents

Founders Supplying & Constructions

Quality Control Plan

services_03
-Method Statement
- ITP
- Preparation of inspection forms
-Shop Drawings
-Material Uses
srv_01
-Material Acceptance (Physical Observation)
-Chemical & Mechanical
- Material Compliance for Technical Specs
services_04
-Thickness Checks
- Lamination Controls
- Tracebillty Strategy
- Welders Certificate
srv_02
-Welding
-PQR ( Procedure Qualification Record )
- WPS ( Weidlog Procedure Specification )
- Final check ( Quantity Controls )
services_sing
-Destructive / Non-destructive tests
- VT ( 100% ), MT, PT, RT
- Tensile Strength tests, etc.
builder carries a steel beam on his shoulder. Generative AI
-Sand Blasting check
-Thickness checkks for corrosion protection coating
-Paint Repair ( if required )
SAFETY PLAN

Safety Plan Instruction and Procedures

services_03
-Moving Equipment (Forklift).
-Cranes.
-Noise.
-Work at Heights.
-Welding and Cutting with Gases (Oxygen, Acetylene, Carbon Dioxide).
-Electric Tools.
-Hand Tools.
-Slip and Fall Hazards.
-Maintenance Operations.
-Electrical Hazards.
-Storage Operations
srv_01
1- Operation and use of forklifts are only permitted by trained personnel who are certified by the responsible manager.
2- Before operating and driving forklifts, the following checks must be performed:
Check the coolant level in the equipment.
Check the engine oil level.
Inspect the equipment gauges and operating switches.
Check the warning devices on the equipment to ensure they are functional.
Inspect the equipment wheels to ensure they are in good condition.
Check the brakes to ensure they are functional (foot brake and hand brake).
Raise and lower the forks to ensure they are operating properly (to the full extent).
Ensure the rearview mirror is functional.
Verify the fire extinguisher is in working order.
Ensure the seatbelt is present and in good condition.
services_04
Employees must wear safety and health gear.
Operate equipment at a moderate speed.
At the beginning of each shift, ensure the following:
a. Check the engine oil level.
b. Ensure the coolant water in the radiator is sufficient, if applicable.
c. Verify there is enough fuel for the equipment's operation.
d. Check the condition of the tires.
e. Ensure the lights and signals are functioning.
f. Confirm that the brakes are operational.
srv_02
Ensure the end-of-travel limit switch is functioning.
Check the integrity of the lifting cables.
Confirm that the wheels do not touch the ground during loading.
Adhere to the crane loading schedules and implement them.
Do not allow workers to ride on the crane.
Do not load more than one pipe at a time.
services_sing
Ensure the ladder's rungs and legs are free from oil and grease.
Confirm that the stabilizing feet are present and in good condition.
Choose the appropriate type of ladder for the required task.
Do not allow more than one person on the ladder at the same time.
Avoid carrying heavy loads while climbing.
Do not carry hazardous materials while climbing.
builder carries a steel beam on his shoulder. Generative AI
1- Ensure the tools are in good condition and remove any damaged ones.
2- Use hand tools for their intended purposes only.
3- Ensure the safety of electrical cables.
4- For pneumatic tools, check the hoses and connecting parts for safety.
5- When performing repair and maintenance operations, ensure the following:
Disconnect the electrical supply.
Ensure the machine is completely stopped.
Secure a safe area for the repairs.
3
Electrical hazards can be divided into two categories:
Electric shock that affects humans when exposed to electricity.
Burns caused by electricity.
Welding Safety Instructions
Adhere to wearing safety gear.
Connect and disconnect welding machines to the power source properly.
Ensure that electrical cables are well insulated.
Confirm that the machine's grounding cable is connected.
Check the functionality of the machine's power switch.
pro_1
Adhere to the use of personal protective equipment and fire safety tools.
Organize warehouses according to the type of materials.
Store materials on shelves safely
Safety Instructions for Openings in Floors and Walls
Any opening in the floor with a diameter of 20 cm or more must be secured with a cover.
Any opening in the wall measuring 75 cm in length and 50 cm in width or more must be secured with barriers.
The height of guardrails should not be less than 1 meter.
part-2.jpg
The pressure in gas cylinders can reach up to (168 kg/cm²).
Use designated carts for transporting cylinders.
Keep cylinders away from high-power electrical devices and direct sunlight.
Always store cylinders in an upright position.
Regularly check the cylinder valve for safety.
Ensure the regulator gauge is functioning to obtain the required pressure.
Be cautious with empty cylinders, as they can still be hazardous.
The maximum storage limit for cylinders is 7 cylinders of 18 kg capacity in one location.
services_05
PPE selection should be based on the specific hazards of the job.
PPE is considered personal responsibility and must be worn during working hours inside the facility.
Using PPE for purposes other than intended outside the facility is prohibited.
Employees must maintain their PPE and are not allowed to make any modifications.
Founders Supplying & Constructions

Partners Of Success

Founders Supplying & Constructions

Our Clients

Our Portfolio

Our Projects

ADMINISTRATIVE CAPITAL SUPPLY

HALL 8000 EGYPT OLYMPIC VILLAGE IN THE NEW ADMINISTRATIVE CAPITAL

LATIN SETTLEMENT NEW ALAMEIN

BADR STATION LRT, BADR CITY

SWIMMING POOLS COMPLEX NEW ADMINISTRATIVE CAPITAL

HALL 8000 EGYPT OLYMPIC VILLAGE IN THE NEW ADMINISTRATIVE CAPITAL

CONCORD ENGINEERING & CONTRACTING ENTRANCE

INDUSTRIAL WASTEWATER TREATMENT PLANT PROJECT EAST PORT SAID

EGYPT'S FUTURE PROJECT 400,000 ACRES - DABAA

Our Blog

Latest Insights and Updates

Quick Contact Information

ENG.kamal Mohamed +201029984188
ENG.Mustafa Abdelmohsen +201003224223
ENG.hussein Alfakharany +201017994400
ENG.Mohsen Yasser +201001459863
Contact Mail fsc@fsc-sae.com
Contact Location 89 El Merghany Street, Fourth Floor - Helipolis

Feel Free to Contact Us